Home Used Machinery/Plants New Machinery/Plants Contact Us.
Premium Membership                          

Buy Seller Info through Premium Membership

Used Machinery


Premimum Member Login



SPONGE IRON PLANTS
12 Nos


A:)SPONGE IRON PLANT WITH STEEL MELTING SHOP FOR SALE



B:)

SPONGE IRON PLANT AT ROURKELA IS FOR IMMEDIATE SALE

Location- Rourkela

Area- 75 Acres

Capacity- 350 Tons Sponge Iron Unit

Scope- Expansion Provision, 150 Acres Land Readily.

Connectivity- Rourkela-Sambalpur Express Highway, Howrah - Mumbai Rail Section

Railway Siding- In 5 Acres of Land

Coal & iron Linkage allotted from State Govt. Captive Mines applied to steel & Mines Dept.

Price Consideration- 120 Cr.



C.)

250 TPD sponge iron plant with induction furnace

We are a composite unit, registered under The Companies Act, 1956, in 2003 – 04 manufacturing Sponge Iron 250 TPD (100 X 2 + 50 X 1) and an Induction Furnace having capacity of 6 MT, make Electrotherm. The plant is located at MIDC, Solapur. The MIDC is situated on Solapur Pune Highway, 15 KMs away from Solapur.


A. Plot Details

a. Plot Area with Compound walls 87175 Sq. Mtrs.

b. Greenery (more than 2000 trees)

c. Well equipped Administration Block

d. Rest Rooms with Staff Quarters

e. Labour Quarters

f. Well furnished Canteen

g. Weigh bridge cap. 80 MT


B. Sponge Division ( All Equipments in Operation )

a. 50 TPD Rotary Kiln commissioned in August 2004

b. First 100 TPD Rotary Kiln commissioned in July 2005

c. Second 100 TPD Rotary Kiln commissioned in November 2009

d. Pollution devices – ESP make – THERMAX

e. Coal Sheds – 10000 MT (3 Sheds)

f. Sponge Shed – 5000 MT (2 Sheds)

g. Iron Ore Crushing Plant 400 MT/day with bunkers

h. PLC controlled by Allen Bradley Drives

i. TWO product house separator units with 11 bunkers

j. Diesel Tank with 12 KL capacity

k. DG Sets

i. 750 KVA X 1 set – make Cummins

ii. 500 KVA X 1 set – make Greaves

l. Automobile Section

i. JCB 430 Z – 02 Loaders

ii. JCB 3DX – 01 No.

iii. Tipper – Ashok Leyland – 01 No.

iv. Tipper – TATA make – 01 No.

v. Tractor – Mahindra – 01 No. (With 1 Trolley)


C. Induction Furnace Division ( All Equipments in Operation )

a. 6 MT ELECTROTHERM make Induction Furnace commissioned in May 2004

b. A 70 X 22 Metres shed with two EOT cranes with 10 and 15 MT capacity respectively

c. Lifting magnet of 2000 MM – 3 Pcs

d. Well equipped LADDLE Pouring System

e. Slag Crusher unit

f. One DG Set 125 KVA make Greaves

g. Transformers – 3750 KVA + 1000 KVA – 1 each

h. Connected load – 4650 KVA






D. Office and Administrative Buildings

a. Well equipped and furnished office of 8000 sq. feet with canteen with 2 dining halls

b. Stores Section with all necessary equipments

c. MIDC Water supply – 3” Line 24 hours

d. Underground water tank with 6 Lacs Ltrs cap

e. All Government Permissions and licenses are VALID till next 3 years including Consent to operate from Pollution Control Board.

f. One 24 seater Bus – make EICHER

g. One 4 seater Mahindra Bolero with Goods carrier capacity 1 MT Model 2003

h. One Mahindra Scorpio

i. One Maruti Alto


E. Our Bankers

a. Oriental Bank Of Commerce, Main Branch, Samarth Nagar, Aurangabad

b. Punjab National Bank, Panjim Branch, GOA


F. Financial Structure

(` In Lacs)
Particulars
Audited Result F.Y. 2005-06
Audited Result F.Y. 2006-07
Audited Result F.Y. 07-08
Audited Result F.Y. 2008-09
Audited Result F.Y. 2009-10

Turnover (Net of Excise & VAT)
2,940.50
3,909.49
5,362.04
6,735.27
5,513.91

Net Profit before Tax
69.74
86.25
232.35
264.15
216.86

Provision for Tax
25.44
10.57
28.32
48.11
75.39

Deferred Tax Liability
17.90
19.61
53.00
50.96
27.86

Net Profit After Tax
44.29
56.06
151.03
165.08
141.47

Share Capital
250.00
250.00
250.00
250.00
250.00

Share Application Money
100.00
0.00
0.00
300.00
255.00

Reserve & Surplus (Cumulative)
78.16
134.22
282.91
447.99
596.16

Secured Loan (Term Loan)
771.43
734.42
580.80
1,218.67
657.86

Unsecured loans from Directors
740.24
723.42
653.12
865.75
1,002.37

Fixed Assets (Gross Block)
1,651.48
1,788.52
1,977.20
2,025.38
3,194.05

Current Assets
1,003.18
731.32
1,316.42
1,163.06
1,755.84

Current Liabilities
478.81
426.38
1,130.43
390.20
480.67

Working Capital Limit
200.00
150.00
300.00
300.00
800.00



Detail of Statutory liabilities paid for last five years. ` In lacs
Particulars
F.Y. 05-06
F.Y. 06-07
F.Y. 07-08
F.Y. 08-09
F.Y. 09-10

Excise Duty (after cenvat)
286.51
467.85
632.68
589.25
243.18

Sales Tax (VAT & CST)
114.23
134.73
161.43
157.17
149.17

Electricity Bill
606.73
829.13
945.73
798.73
713.39

Water
7.77
10.31
12.69
15.39
17.41



G. Reason for Sell out

The Management cannot concentrate on the unit as they have diversified the activities in large scale in Breweries


D.)
SPONGE IRON PLANT FOR SALE IN MUMBAI

Installed Capacity: - 2 x 60 TPD with pre-heating Technology.

Plot Area: - 21.5 Acres.

Electric connected Load: - 500 KVA applied for additional 250 KVA.

 Kiln Size:-

  • Main Kiln – Dia: 2.2 mtr, Length: 30 mtr.
  • Pre Heater - Dia:1.5 mtr, Length: 30 mtr
  • Cooler - Dia:1.5 mtr, Length: 30 mtr
    Plant Details: -

    6 Nos. stock hoppers for finished goods (125 tons each)
    2 Nos. I-beam Stock Hopper (125 ton each)
    6 Nos. Iron ore, Coal & Dolomite stock hoppers.
    1 No. Lumpy Crusher
    1 No. Coal Crusher
    1 No. Iron ore Crusher
    1 No. Coal screener
    1 No. Extra coal screening unit at Coal Shed.
    1 No. Iron ore Screener.
    1 No. Truck Tippler (Truck unloader)
    1 No. Weighbridge (60 ton)
    2 Nos. Dumper (Ashok Leyland)
    2 Nos. Tractor Loader
    1 No. Tractor with Trolley
    1 No. JCB
    1 no.Coal Shed
    1 no. Administrative & Control Building
    1 No. DG set (500 KVA)
    1 No. Transformer (1000 KVA)

 The plant is located at one of the best industrial area for steel in Maharshta , district Thane, around 75 Km from Mumbai City. Today it has become the steel hub of Maharashtra with over 25 induction furnaces and 5 Concast plants. The biggest advantage of this place is its proximity from the Mumbai city, which is the main market for steel consumption and the proximity from Seaports (Mumbai port, Nhava Seva port, Dharmtal port, etc.)

 The plant is in the running condition with all the latest technologies and equipments. It is equipped with the latest technology of preheating which helps in the reduction of coal consumption.

E.) 

100 TPD Sponge Iron manufacturing plant

BRIEF DETAILS OF THE PLANT

 

1.

Existing Capacity

:  100 TPD Sponge Iron manufacturing plant.

 

:  80MT capacity Iron ore crushing unit adjacent to   

   plant boundary.

 

2.

On going Expansion

:  2nd DRI kiln of 100TPD

: 8 MW power plant

: 8MT * 2 Ingot furnaces.

:  Pollution approval and other related approvals

   has already obtained.

: Foundation work of 2nd DRI kiln completed.

 

3.

Location

:  15KM from Sambalpur (towards Jharsuguda) in the district of Sambalpur.

:  No other sponge iron plant in a vicinity of 20Km

 

4.

Land

:  Total 71 acres out of which 35acre private free land in the name of company and 36 acres from IDCO on lease.

 

5.

Coal Linkage

:  2400 MT coal linkage from MCL.

 

6.

Nearest Coal Mines

:  At a distance of 60 KM. ( Brajarajnagar)

 

7.

Nearest Railway siding

:  At a distance of 30 KM. (Hirakud)

 

8.

Ownership

:  Pvt. Ltd. Company with 100% Shareholding of one single family paid up equity capital around 15crore.

9.

Banker

:  Andhra Bank

   Term Loan outstanding – 4.5 Crores

   Cash Credit – 3 Crores

 

10.

Other Assets

:  Loader, JCV, Excavator, Utility, Vehicles and all other related assets accessories are there.

 

11.

Mining Leases

i. ML application dt. 13/07/2006 over 185.679 hectors area  in village Tantigram, Jaldhiri & Khajuridihi of Sundargarh district:

 

: Grant of ML recommended by Director of mines for captive use.

 

: Rejected by govt. of Orissa for want of some documents.

: Mining tribunal, govt. of India seta sided the order and directed govt. of Orissa for reconsideration.

 

ii.  Other 4ML applications in different area are in pipe line.

 

12      Price                                  35 Crores





F.)
Sponge iron plant & mines in Orissa

BRIEF DETAILS OF THE PLANT

1.
Existing Capacity
: 100 TPD Sponge Iron manufacturing plant.

: 80MT capacity Iron ore crushing unit adjacent to

plant boundary.

2.
On going Expansion
: 2nd DRI kiln of 100TPD

: 8 MW power plant

: 8MT * 2 Ingot furnaces.

: Pollution approval and other related approvals

has already obtained.

: Foundation work of 2nd DRI kiln completed.

3.
Location
: 15KM from Sambalpur (towards Jharsuguda) in the district of Sambalpur.

: No other sponge iron plant in a vicinity of 20Km

4.
Land
: Total 71 acres out of which 35acre private free land in the name of company and 36 acres from IDCO on lease.

5.
Coal Linkage
: 2400 MT coal linkage from MCL.
6.
Nearest Coal Mines
: At a distance of 60 KM. ( Brajarajnagar)

7.
Nearest Railway siding
: At a distance of 30 KM. (Hirakud)

8.
Ownership
: Pvt. Ltd. Company with 100% Shareholding of one single family paid up equity capital around 15crore.

9.
Banker
: Andhra Bank

Term Loan outstanding – 4.5 Crores

Cash Credit – 3 Crores

10.
Other Assets
: Loader, JCV, Excavator, Utility, Vehicles and all other related assets accessories are there.

11.
Mining Leases
i. ML application dt. 13/07/2006 over 185.679 hectors area in village Tantigram, Jaldhiri & Khajuridihi of Sundargarh district:

: Grant of ML recommended by Director of mines for captive use.

: Rejected by govt. of Orissa for want of some documents.

: Mining tribunal, govt. of India seta sided the order and directed govt. of Orissa for reconsideration.

ii. Other 4ML applications in different area are in pipe line.
12 Price 35 Crores
MINES

One 386.88 Hectors iron ore mines has granted in the year of 1976 for 30 years mining lease. In due time RML has applied. But due to non working govt. had rejected that mines. The mine owner has got the tribunal order his favor. The tribunal order copy & deposit report are in attachment file.





G.) SPONGE IRON/PIG IRON PLANT FOR SALE IN WEST BENGAL


RUNNING 2X100 SPONGE IRON PLANT IN PURULIA DISTT.1X100 TPD UNDER INSTALLATION.

65 CUM. CAPAITY PIG IRON PLANT WITH SINSTER

LAND APPROXIMATELY 45 ACRES.

2

Plant Capacity

2x100 TPD Sponge Iron plant &

65 Cum Mini Blast Furnace running.

1x100 TPD Sponge Iron Plant under Installation.

3

Location

Purulia, West Bengal

4

Land

40 Acres (Approx.)

5

Plant Status

2 x 100 TPD capacity is under operation with ESP and ECMCS facility.

1X 100 TPD plant under installation.

6

Year of commencement

Sponge Iron Plant commenced productions in the year 2004 and

Pig Iron Plant commenced productions in the year 2005.

7

Industrial Category

The plant site is strategically situated in peaceful area falling under Group ‘C’ as categorized by Industry Deptt.

8

Source of power, Load Factor

Energy Supply connection from WBSEB.

9

Capacity

Sponge Iron: 750 KVA Available & 900 KVA Sanctioned

Pig Iron: 900 KVA available

1000 KVA Sanctioned

10

Source of Water

Bore Wells : 11 Nos. 4” 2 Nos, 6” 1 No., 8” 5 Nos.

& 8” 3 Nos. under repair.

11

Coal Linkage

Coal Linkage with CCL, FSA Due.

12

Iron Ore Linkage

N. A.

13

No. of employees

113 (Both included) 60 others.

14

List of major equipments with details

Both the plants are new and all the Equipment are in excellent running condition.

Sponge Iron:

Kiln and Cooler Assembly, Compressors, Slip Rings, Screen Coal Impactor, Lorry Weigh Bridge, Conveyor Belts, Elevators and Pulleys, Water Pumps, Refractory, Filters, Lab Equipments, Pollution Control Equipments.

15

Infrastructure with details of rail, road, boundary walls etc.

Ideally located on NH- 32 geographically suited with excellent infrastructure.

Plant site strategically located for in-warding and out-warding of raw materials.

The land is well constructed with boundary wall all around.

16

Work shop

A small workshop with lathe for minor maintenance.

17

Any additional facility :

Iron Ore Crusher :

DG Sets :

Iron Ore Crusher of 35 TPH inside the Plant.

D.G. Sets of 1250 KVA, 1000 KVA & 380 KVA also available.

18

Material handling system

Available

19

Warehouse or store room

Plenty

20

Sponge iron shed if any.

One Sponge Shed & One Coal Shed.

21

Office structure

v Staff Quarters

v Office Building

Two-storied Building for staff Quarters with an accommodation capacity for 200 persons are available.

A well constructed two-storied Administrative Office Building is also available and a gracious temple complex.

22

Outstanding Liabilities / Pending Litigations

Plants to be handed over with Nil Liabilities

Pending Litigations – Nil

23

Transport

2 Nos. of JCBs & 2 Nos. of Dumpers are available to work within the factory premises.

24.

Registration

Both the Units are registered with all concerned Govt. Registering Authorities with updated status.

Following items will be excluded in the deal :-

Sl.No.

Particulars

Remarks

01.

Transport

Extra Transport vehicle like Dumper, Tractor & Loader is excluded.

02.

Govt. & Other Security

Any Govt. deposits (Security Money) with Electricity Board or any other subsidy or security will be separate & will have to be paid extra.

03.

Raw Material

All raw materials like Coal, Coke, Iron Ore, Dolomite, Fines etc. being part of working capital will be dealt with separately.

The Deal will include only land, Shed, Building & Plant and machinery. All other items are excluded and will be dealt upon separately.



H.)
RUNNING SPONGE IRON PLANT FOR SALE IN GOA Panaji

DETAILS OF FIXED ASSESSTS
Weigh Bridge 1 no. 60 M.T.Capacity
New DG Set 1 no. 500 KVA
Bricks Manufacturing Machine
Hydrulic Press 1 no. 5000 Bricks per day Capacity
Automatic (Mechanical Press) 1 no. 10000 Bricks per day Capacity
Crushers
Iron Ore Crushers - 3 nos.
Coal Crusher - 1 no.
Cooling Tower 1 no.
Compressors 2 nos.
Storage Tank Air Compressor 1 no.
Lube Compressor 1 no.
Storage Tank (Diesel) 1 no.
Welding Machines 10 nos.
Motors & Pumps (With Spares Motors & Pumps)
Lathe Machines 2 nos.
Radial Drill Machine 1 no.
Shaper Machine 1 no.
QC Lab. (Well Equipped for Testing Rawmaterials and Finished Product) 1 Set
Borewells 2 nos.
Sheds
Coal Shed with PCC 2 no.
Bricks Mfg. Shed with PCC 1 no.
Finished Goods Shed with PCC 1 no.
Work Shop and D.G.Shed 1 no.
Dolomite shed 1 no.
Guest House (for staff) 1Block ( 10 Rooms)
Labour Rooms 16 nos.
Canteen 1 No.
Control Room With (Office,Store etc.) 1 no.
Boundry Wall & Compound Wall
Movable Assests
Tata Tipper 1 no.
Tankar 1 no.
Tata Bus 1 no.
JCB (New) 1 no.
Tata Sumo (New) 1 no.
Motor Cycles 2 nos.
DETAILS OF PLANT
Raw Material Plant - Coal
Ground Hopper Vibrating Fedder
Belt Conveyors
Vibrating Screen
Coal Impector
Raw Material Plant - Iron Ore
Ground Hopper Vibrator Fedder
Belt Conveyors
Vibrator Screen
Intermediate Bins
Rotary Kiln with Accessories
Cooler with Accessories
Product Seperation with Accessories
Magnetic Seprator
Weigh Feeders
Pollution Equipments :
Air Cylinders
Air Tank & Tubes
Heat Exchanger 1 no.
Heat Exchanger - Stand by 1 no.
ID Fan New 1 no.
ID Fan New Stand by 1 no.
FD Cooler with 8 nos.Fan (Stand by) 1 no.
Bag Filters - Big 2 nos.
Bag Filters - Small 4 nos.
De-ducting Unit (Chimney) 4 no.
Stack (Chimney) 1 no. (50 meters. Height)
Current Conversion Status as per Market for Per M.T.
Raw Material
Coal 1.000 M.T. @ 4300/- 4300.00
Iron Ore 2.000 M.T. @ 2900/- 5800.00
10100.00
Finished Goods
1.000 M.T. Sponge Iron @ 13500/- 13500.00
Conversion 3400.00
Expenses.
Bank Interest,Salary / Wages (Contractor)
Stores, and Electricity etc. 1800.00
Profit Margin PMT 1600.00





I.)

ORISSA

LAND

TOTAL AREA UNDER POSSESION -- -- 79ACRS.

 

 

DEVELOPED AREA -- WITH BOUNDARY WALL -- 40Acrs.

 

 

(Balance Land for Staff Quarter, Approach Road and Char Dumping)

 

 

ADDITIONAL 65 ACRES OF GOVT. LAND BEHIND & ADJACENT TO THE POWER PLANT

 

WILL BE ALLOTED WITHIN 1-2MONTHS FROM IDCO. (All the related paper work

 

 

completed & the file forwarded to District Collector for Final Allotment by IDCO.)

 

 

LIST OF PLANT & MACHINERY

Sponge Iron Plant

 

 

 

 

 

 

TOTAL SPONGE IRON CAPACITY - 1.1 LAC TPA

 

 

 

 

 

 

Sl.No.

Particulars

MAKE

Nos.

1

KILN & COOLING SHELL-350TPD

BEEKAY ENGG.

1

2

TRANSFORMER 1600 KVA

TRUEVOLT

1

3

ELECTRIC MAIN PANEL

ABB

1

4

INSTRUMENTATION PANEL

ABB

1

5

AC VARIABLE SPEED DRIVES WITH PANEL

ABB

1

6

DC ELECTRIC MOTOR (MAIN-150KW + 1SPARE)

KIRLOSKAR

2

7

BELT CONVEYOR & ACCESSORIES

BEEKAY ENGG.

1

8

IMPACT CRUSHERS

BEEKAY ENGG.

2

9

VIBRATING SCREENS

BEEKAY ENGG.

4

10

VIBRATING FEEDERS

BEEKAY ENGG.

5

11

TRAMP IRON SEPARATOR

BEEKAY ENGG.

1

12

DRUM TYPE MAGNATIC SEPARATOR

BEEKAY ENGG.

2

13

WEIGH FEEDERS

ELECTRO ZAVED

5

14

PNEUMATICS & HYDRAULICS

GUJRAT HYDRAULIC

1

15

SWIRLERS, AIR TUBE, H.P. TUBE

 

1

16

NOZZLE PLANTES C.B.PIPE, COALPIPE

 

1

17

BI-METTALIC SLIP RING

BEEKAY ENGG.

1

18

DP VALVES

 

1

19

FILTERATION & LUBRICATION UNIT

 

1

20

AIR BLOWER

 

4

21

ELECTRICAL SLIP RING

 

18

22

GEAR BOXES & ACCESSORIES

ELECECON/ SHANTI

11

23

ROTARY AIR LOCK FEEDERS

 

2

24

COOLING WATER PUMPS

 

4

25

LOBE COMPRESSOR 110HP

USHA

2

26

SCREW COMPRESSOR 75HP

CP

2

27

CENTRALISEGREASE PUMP UNIT

CROMPTON

1

28

LDO PUMP

CROMPTON

1

29

WATER COOLING NOZZLES

 

10

30

BAG FILTERS & FANS

REICO

7

31

LIGHTING & FITTINGS

 

1

32

COOLING TOWER

 

2

33

GAS CONDITIONING TOWER

BEEKAY ENGG.

1

 

 

 

 

 

 

 

 

[2]

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Power Plant TOTAL TURNKEY PROJECT BY THERMAX

 

 

 

 

 

 

 

TOTAL POWER PLANT CAPACITY -

4MW - AFBC

 

 

 

8MW - WHRB

 

 

 

4MW - GRID (Under implementation)

 

 

 

 

Sl.No.

Particulars

MAKE

Nos.

1

AFBC BOILER 22 TPH

THERMAX

1

2

GAS CONDITIONING TOWER

 

1

3

ELECTROSTATIC PRECIPITATOR

THERMAX

2

4

COOLING TOWER 3600m3 PER Hr.

PAHARPUR

2

5

STEAM TURBINE 12MW

TRIVENI

1

6

DM PLANT 5m3 PER Hr. WITH PRE FILTRATION PLANT

 

1

7

COOLING WATER PUMPS 200KW EACH

KIRLOSKAR

3

8

ASH HANDLING SYSTEMS

 

1

9

ASH SILO

 

1

10

COAL HANDLING SYSTEM

 

1

11

AIR COMPRESSOR

CP

1

12

CONTROL ROOM A.C. SYSTEM

 

1

13

EOT CRANE FOR TURBINE 40MT

REVA

1

14

SWITCH GEAR & CONTROL PANEL FOR BOILER

ABB

1

15

TURBINE PUMPS, BOILER FEED PUMPS & OTHER PUMPS

 

14

16

SUBSTATION EQUIPMENTS & CABLES

 

1

17

TRANSFORMER 2000KVA

TRUVOLT

1

18

REFRACTORY FOR BOILER & DUST SILO

TRL

1

19

CHIMNEY & MECHANICAL STRUCTURE

 

1

20

PLANT ILLUMINATION SYSTEMS

 

1

21

WHR BOILER -- 38TPH

THERMAX

1

22

BAG FILTERS

REICO

1

23

PNEUMATIC CONVEYOR SYSTEM FOR FLY ASH HANDLING

 

1

24

GRID POWER PROJECT UNDER IMPLEMENTATION -4MW

 

 

 

(EQUIPMENTS ORDERED, TOWER LINE INSTALLATION COMPLETED)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

[3]

 

 

 

 

Steel Melting Shop

 

 

 

 

 

 

 

TOTAL SMS CAPACITY - 4 FURNACE x 11 HEATS PER DAY (CONSERVATIVE TARGET)

 

 

  x 8MT x 300 DAYS = 1.05 LAKHS MT. P.A

 

 

 

 

 

 

 

 

 

 

Sl.No.

Particulars

MAKE

Nos.

1

INDUCTION FURNACE 8MT EACH

INDUCTOTHERM

4

 

(WITH POWER PACK, 8 CRUCIBLES & 4 TRANSFORMERS OF 3725 KVA EACH)

 

 

2

COOLING TOWER

PAHARPUR

2

3

DM PLANT

PAHARPUR

1

4

HT & LT PANELS WITH CAPACITOR BANK

SEIMENS

1

5

TRANSFORMER MAIN & AUXILIARY

KIRLOSKAR

3

6

EOT CRANE 1No --40MT, 2Nos --15MT, 1No --10MT

REVA

4

7

CRANE GIRDER WITH DSL LINE

 

2

8

LADDLE FOR REFINNING FURNACE--16MT --2Nos, 8MT --2Nos

INDUCTOTHERM

4

9

CONTINUOUS CASTING MACHINE DOUBLE STAND (4X7)

CONCAST INDIA

1

10

PUMPS (DIFFERENT CAPACITIES)

 

8

11

PIPING & VALVES

 

1

12

SUBSTATION EQUIPMENTS & CABLES

 

1

13

MAGNETS

 

3

14

MATERIAL HANDLING EQUIPMENTS

 

1

15

D.G.SET WITH PANEL 500KVA

JACKSON

4

16

WEIGH BRIDGES 100MT & 60MT

 

2

17

LAB EQUIPMENTS

 

1

18

TOOLS & EQUIPMENTS

 

1

19

BAG FILTERS & FANS

REICO

3

20

LIGHTING & FITTINGS

 

1

21

AUXILIARIES FOR SMS & CCM

 

1

22

LADDLE PRE-HEATING FURNACE

INDUCTOTHERM

2

23

PNEUMATICS & HYDRAULICS

GUJRAT HYDRAULIC

1

24

SCREW COMPRESSOR

CP

2

25

ELECTRIFICATION

 

 

26

TUNDISH

TRL

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

[4]

R.M.Handling System

 

 

Auxiliary, Supporting Equipments & Civil Construction

 

 

 

 

 

 

Sl.No.

Particulars

MAKE

Nos.

1

IRON ORE CRUSHERS (ONLINE) 50TPH EACH

MR UDYOG

2

2

COAL CRUSHERS (ONLINE) 40TPH EACH

MR UDYOG

2

3

CONVEYOR LINE FOR COAL & IRON ORE

INHOUSE

1200Mtrs

4

STOCK HOUSE -- 6BINS OF (200 & 100MT CAPACITY)

BEEKAY

1

5

PRODUCT HOUSE -- 6BINS OF 100MT EACH

BEEKAY

1

6

INTERMEDIARY BUNKER

BEEKAY

1

7

LUMP COAL CRUSHER (INDEPENDENT UNIT WITH SHED & CONVEYOR SYSTEM -- 40TPH CAPACITY

MR UDYOG

1

8

DOLO CHAR BUNKER -- 200MT

BEEKAY

1

9

DIESEL FILLING STATION -- 2 DISPENSERS 15KL EACH STORAGE TANKS

INDIAN OIL

1

10

3 STORIED CONTROL ROOM BUILDING (FULLY AIR CONDITIONED WITH CENTRAL LAB, DIRECTORS CHAMBER, HOD CHAMBERS, CONFERENCE ROOM, REST ROOM, 3TOILETS, PANTRY ETC.)

IN HOUSE

1

11

2 STORIED ACCOUNTS & DESPATCH OFFICE BUILDING (AIR CONDITIONED)

IN HOUSE

1

12

RIVER WATER INTAKE WELL (2 VERTICAL PUMPS 75HP EACH)

IN HOUSE

1

13

WATER STORAGE RCC TANKS (25LAKH LITERS & 10 LAKH LITERS)

IN HOUSE

2

14

RAW MATERIALS & FINISHED PRODUCTS SHEDS

AMIYA ENGG.

6

15

FLY ASH BRICKS MANUFACTURING UNIT

IN HOUSE

1

16

SECURITY & TIME OFFICE

IN HOUSE

1

17

GENERAL STORES BUILDING

IN HOUSE

1

18

SMS STORES BUILDING

IN HOUSE

1

19

DRI STORES BUILDING

IN HOUSE

1

20

POWER PLANT BUILDING

IN HOUSE

1

21

WATCH TOWERS

IN HOUSE

4

22

STAFF & WORKERS VEHICLE & CYCLE PARKING STAND

IN HOUSE

1

23

COLONY FOR 300 WORKERS (OUTSIDE PLANT PREMISES)

IN HOUSE

1

24

SLAG CRUSHING UNIT (UNDER IMPLEMENTATION)

MR UDYOG

1

25

FULLY RCC INTERNAL ROADS (UNDER CONSTRUCTION)

 

 

26

COMPLETE RCC DRAINAGE SYSTEM (UNDER CONSTRUCTION)

 

 

27

LOADERS AND VEHICLES - 2NOS. JCB 430Z HEAVY DUTY LOADERS, 2NOS. JCB BACHOE LOADERS, 2NOS. SCORPIO, 2NOS BOLERO, 1 NO. MINI BUS.

 

9

 



J.)
50*2 TPD  RAIPUR

SPONGE IRON PLANTS.
100TPD IN RAIPUR
We have fully functional Sponge Iron Plant with capacity of 50*2 TPD. First KILn was installed in the year 2002 and second KILN was installed in 2008 with ESP in an area of 13 acres. This plant is situated in raipur.This company also has 150 acres of semi approved mines.


K.)
2 * 100 TPD  KEONJHAR

1.Location----------------------:keonjhar.



2. Capacity---------------------:2 * 100 TPD



3.Area---------------------------:Existing around 40 Acres.

Applied for Govt.Land 50

Acres(in addition to above)



4.Other Accessories---------: 5 Nos. of DG Sets

Product House

2 Weigh Bridges

Coal shed

ESP

Infrastructure for staff quarters,office,canteen

Iron ore crusher(100 TPH)



5.Facilities----------------------: Coal linkage & permit with mahanadi coalfields ltd.

Iron linkage with OMC

L.D.O/Diesel linkage with Indian oil corporation ltd.



6.power--------------------------: 1.6 * 2 (WHRB)50% Constructed



7.Boundry walls,borewell,internal road.





Prices----------------------------: 45 crores


L.)
350 TPD one


Area---92 Acres (near anugul)



Kiln---350 TPD one



Induction------4* 7 Tones

1*8 Tones



POWER---



WHRB8 M.W

AFBC----4 M.W





Coal linkage10000/month

Ore(OMC)Linkage30000/month





IRON ORE MINES





Area-----154 Acres(Mine under RML,running in deemed extension)



M.L. over in 2004 & RML applied in 2003.








Deposit2.2 million tone in IBM(actually around 5 million tone)



Grade---58 to 63+



Total Price-----290 crores(non negotiable)

Bank liability 40crores






Copyright 2004 All Rights Reserved.